BEGIN:VEVENT
UID:verixa-patent-filing-check-20260614@verixa
DTSTART;TZID=Asia/Kolkata:20260614T090000
DTEND;TZID=Asia/Kolkata:20260614T093000
SUMMARY:Verixa — Patent filing go/no-go check (FD tomorrow)
DESCRIPTION:Verify filing PDFs final\, counsel Claim 1 review status\, drawings\, Sense7AI MSA/inventorship. Verify current fees/forms at ipindia.gov.in. 8 Band-A provisionals: P01\, P02\, P02b\, P03\, P04\, P05\, P09\, P10 (P06 rides P01).
BEGIN:VALARM
TRIGGER:-PT1H
ACTION:DISPLAY
DESCRIPTION:Patent filing go/no-go check
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:verixa-fd-efile-20260615@verixa
DTSTART;TZID=Asia/Kolkata:20260615T090000
DTEND;TZID=Asia/Kolkata:20260615T110000
SUMMARY:🔴 Verixa — FD: E-FILE 8 India provisional patents (priority date locks)
DESCRIPTION:Filing Day target per tracker. Attorney review required before filing. Priority date + §39 clock start today. After filing: update deck slide 16 to "8 provisional patent applications filed (India\, June 2026)".
BEGIN:VALARM
TRIGGER:-PT2H
ACTION:DISPLAY
DESCRIPTION:E-file provisionals today
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:verixa-gate1-structure-20260626@verixa
DTSTART;TZID=Asia/Kolkata:20260626T090000
DTEND;TZID=Asia/Kolkata:20260626T100000
SUMMARY:🔴 Verixa — GATE 1: Entity structure + instrument locked?
DESCRIPTION:End of Phase 0. Counsel engaged? US Inc ↔ India Pvt Ltd resolved? Instrument decided (SAFE/CCPS/priced)? Cap table + ESOP? 18-mo budget? Scope-lock matrix? IP assignment aligned? Rule: structure not locked = no investor outreach.
BEGIN:VALARM
TRIGGER:-P1D
ACTION:DISPLAY
DESCRIPTION:GATE 1 tomorrow — structure lock
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:verixa-loi-weekly-2026@verixa
DTSTART;TZID=Asia/Kolkata:20260615T090000
DTEND;TZID=Asia/Kolkata:20260615T093000
RRULE:FREQ=WEEKLY;BYDAY=MO;UNTIL=20260928T043000Z
SUMMARY:Verixa — LOI sprint weekly check-in (Lane A/B + co-founder + YC)
DESCRIPTION:Weekly: Lane A US biotech conversations (target 10–15)\, Lane B India CDMO (14 First Wave accounts)\, LOIs toward 2–4 by Sep 30\, co-founder pipeline (YC matching/EF/Antler/EIR intros)\, YC application status.
END:VEVENT
BEGIN:VEVENT
UID:verixa-s39-window-20260727@verixa
DTSTART;TZID=Asia/Kolkata:20260727T090000
DTEND;TZID=Asia/Kolkata:20260727T093000
SUMMARY:Verixa — §39 foreign-filing window clears: US filing decision
DESCRIPTION:If FD was Jun 15: 6-week §39 window cleared (absent §35 secrecy direction). Decide US provisionals now vs PCT route (PCT decision due Dec 15). Form 3 updates are event-triggered on foreign filings.
END:VEVENT
BEGIN:VEVENT
UID:verixa-phase2-softcircle-20260803@verixa
DTSTART;TZID=Asia/Kolkata:20260803T090000
DTEND;TZID=Asia/Kolkata:20260803T100000
SUMMARY:Verixa — Phase 2 kickoff: soft-circle narrative test (EU AI Act live)
DESCRIPTION:Book 5–7 advice-not-money meetings: Lightspeed\, NewVale\, Blume\, HealthQuad\, Vertex. Test 4-sentence pitch\; log objections verbatim. EU AI Act applied Aug 2 — the "why now" is live news.
END:VEVENT
BEGIN:VEVENT
UID:verixa-phase3-prep-20260901@verixa
DTSTART;TZID=Asia/Kolkata:20260901T090000
DTEND;TZID=Asia/Kolkata:20260901T100000
SUMMARY:Verixa — Phase 3 prep: data room ready + batch partner meetings
DESCRIPTION:Data room: deck\, dossier\, competitive xlsx\, 3-yr plan\, IP narrative\, URS traceability\, validation plan\, LOIs\, cap table\, entity docs\, Q&A log. Batch all first meetings into 2–3 week window. Leads: Lightspeed or Blume/HealthQuad.
END:VEVENT
BEGIN:VEVENT
UID:verixa-gate2-loi-20260930@verixa
DTSTART;TZID=Asia/Kolkata:20260930T090000
DTEND;TZID=Asia/Kolkata:20260930T100000
SUMMARY:🔴 Verixa — GATE 2: ≥2 LOIs? Proceed vs bridge fallback
DESCRIPTION:≥2 LOIs → formal process to term sheet. <2 → YC + $300–500K operator-angel bridge (single SPV\, no pitch fees)\; revisit $8M pre. <20% meeting conversion → fix narrative. No marginal co-founder under raise pressure.
BEGIN:VALARM
TRIGGER:-P1D
ACTION:DISPLAY
DESCRIPTION:GATE 2 tomorrow — LOI checkpoint
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:verixa-pct-decision-20261215@verixa
DTSTART;TZID=Asia/Kolkata:20261215T090000
DTEND;TZID=Asia/Kolkata:20261215T100000
SUMMARY:Verixa — PCT / international patent strategy decision (FD+6mo)
DESCRIPTION:Decide PCT vs direct foreign vs India-only per family (8 provisionals). Complete-spec hard deadline Jun 15 2027. Trade-secret elections become irreversible at complete-spec. Involve patent counsel. Budget check vs seed legal/IP line.
END:VEVENT
BEGIN:VEVENT
UID:verixa-completespec-warning-20270315@verixa
DTSTART;TZID=Asia/Kolkata:20270315T090000
DTEND;TZID=Asia/Kolkata:20270315T100000
SUMMARY:Verixa — Complete-spec EARLY WARNING (hard deadline Jun 15)
DESCRIPTION:3 months to §9(1) deadline. Counsel engaged for complete-spec drafting? Families proceeding vs abandoned? Trade-secret elections final? PCT filings ready? Drafting takes weeks per family — 8 families = start now.
BEGIN:VALARM
TRIGGER:-P1D
ACTION:DISPLAY
DESCRIPTION:Complete-spec early warning
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:verixa-completespec-final-20270601@verixa
DTSTART;TZID=Asia/Kolkata:20270601T090000
DTEND;TZID=Asia/Kolkata:20270601T100000
SUMMARY:🔴 Verixa — Complete-spec FINAL CHECK (2 weeks to hard deadline)
DESCRIPTION:Per family: complete spec counsel-reviewed + ready to file? PCT ready where elected? Deliberate abandonments confirmed in writing? E-filing logistics verified at ipindia.gov.in?
BEGIN:VALARM
TRIGGER:-P1D
ACTION:DISPLAY
DESCRIPTION:Complete-spec final check
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:verixa-completespec-deadline-20270615@verixa
DTSTART;TZID=Asia/Kolkata:20270615T090000
DTEND;TZID=Asia/Kolkata:20270615T110000
SUMMARY:🔴🔴 Verixa — HARD DEADLINE: Complete Specifications due (§9(1))
DESCRIPTION:FD+12 months. Missing = applications deemed abandoned. Also Paris Convention PCT priority deadline. NO SLIP.
BEGIN:VALARM
TRIGGER:-P7D
ACTION:DISPLAY
DESCRIPTION:Complete specs due in 7 days
END:VALARM
BEGIN:VALARM
TRIGGER:-P1D
ACTION:DISPLAY
DESCRIPTION:Complete specs due TOMORROW